-
Olympic Steel has opened a new 120,000-square-foot processing facility in. Buford, Ga. The location expands Olympic¡¯s Southeastern region footprint, which also includes facilities in Locust, N.C.; Winder, Ga.; and Hanceville, Ala.
Read More
-
Alliance Steel has completed its move to Gary, Ind. The company has been located in Bedford Park, Ill., for the previous 20 years. The Bedford Park location will cease operations in mid-2020.
Read More
-
Target Steel is installing its third Braner USA turret head slitting line with CNC shape-correction leveling and automatic slit coil packaging in its Detroit flat-rolled coil processing center. Target Steel¡¯s latest high-performance Braner slitter is slated to process high-strength cold rolled, hot rolled, and prepainted coil to 30 tons by 72 inches wide in gauges from 0.015 inches through 0.250 inches.
Read More
-
United Performance Metals has installed a new 8KW fiber laser in the company¡¯s Cincinnati headquarters.
Read More
-
JM Steel, a JENNMAR affiliate, will expand its footprint outside the Southeast with construction of a facility near Steel Dynamics¡¯ new mill in Sinton, Texas. SDI is building a 3 million-ton mill with ¡°next generation: EAF technology, expected to open in 2021.
Read More
-
Kloeckner Metals Corporation, Roswell, Ga., has promoted Andrea Moseley to the position of chief financial officer. She will replace Kirk Johnson, who retired on March 31.
Read More
-
O¡¯Neal Steel will open a new 64,000-square-foot facility in St. Joseph, Mo. The warehouse is the 19th facility for O¡¯Neal Steel and first in Missouri.
Read More
-
Leeco Steel, Lisle, Ill., has appointed John Purcell as vice president of sales. The appointment became effective today.
Read More
-
Tampa Steel & Supply, a veteran-owned metal fabrication and services center in Tampa, Fla., has launched a new online store, Urban Metals. The site will provide custom plasma-cut metal art to the Tampa Bay area and beyond, shipping nationally.
Read More
-
Alro Steel has opened its Oshkosh, Wis., facility. The new 194,000-square-foot facility is located at 3970 Poberezny Road.
Read More